No Nama Peserta K B A T Skor
Teknis
Penawaran Penawaran Terkoreksi Hasil Negosiasi H Skor
Harga
Skor
Akhir
P PK Alasan
1 CV. METRO PASEE PACIFIC - 83.881.582.7-101.000 Rp 449.666.827,84 Rp 449.666.827,84 Rp 449.666.827,84
2 TUAH COT SEUBATI - 02.071.673.4-101.000
3 CV. Bintang Muda Perdana - 03.003.663.6-101.000
4 CV. UJUNG RIMBA - 03.105.077.6-102.000
5 CV. SARANA PRATAMA - 81.396.189.3-101.000
6 CV. FARRAS JAYA - 02.887.615.9-104.000
7 CV. ZUFARA PELITA - 82.322.466.2-102.000
8 CV.KANDANZE - 02.176.991.4-102.000
9 CV. PUTRA LAMKUTA - 82.322.497.7-102.000
10 CV. LHAURA KARYA - 74.278.827.6-102.000
11 CV. RESTU ANGKASA JAYA ANDALAN - 03.255.737.3-102.000
12 CV. Puga Mandiri - 02.122.544.6-102.000
13 CV. Tri Jaya Family - 03.262.142.7-101.000 Rp 451.765.986,62 Rp 451.765.986,62 1. Metoda Pelaksanaan Pekerjaan yang disampaikan dalam Dokumen Penawaran tidak menyampaikan pekerjaan Divisi 3 item Galian Struktur dengan kedalaman 0 - 2 meter sementara dalam Dokumen Pengadaan dipersyaratkan. 2. Metoda Pelaksanaan pekerjaan yang disampaikan dalam Dokumen Penawaran tidak menjelaskan secara terperinci untuk setiap masing-masing item pekerjaan Divisi 7. item 7.1 (7) Beton mutu sedang fc' 20 Mpa, item 7.1(8) Beton mutu rendah fc' 15 Mpa, item 7.1(9) Beton siklop fc' 15 MPa, dan 7.1(10) Beton mutu rendah fc'10 MPa. tidak dijelaskan penggunaan peralatan yang digunakan seperti Concrete Pan. Mixer, Concrete Mixer, Truck Mixer, Concrete Vibrator, dan Water Tanker, sementara dalam Analisa Harga Satuan peralatan yang dipergunakan yaitu Concrete Pan Mixer, Concrete Mixer, Truck Mixer, Concrete Vibrator, dan Water Tanker 3. Metode Pelaksanaan yang disampaikan dalam dokumen penawaran pada pekerjaan Divisi 7. item 7.9.(1) Pasangan Batu tidak menjelaskan peralatan Concrete Mixer dan Water Tanker secara terperinci sementara dalam Analisa harga satuan peralatan yaitu Concrete Mixer dan Water Tanker. 4. Metoda Pelaksanaan Pekerjaan yang disampaikan dalam Dokumen Penawaran tidak menyampaikan pekerjaan Divisi 7. item 7.10.(1) Pasangan Batu Kosong yang diisi adukan sementara dalam Dokumen Pengadaan dipersyaratkan. 5. Analisa Harga satuan yang disampaikan dalam Dokumen Penawaran tidak menyampaikan pekerjaan Divisi 7. item 7.10.(1) Pasangan Batu Kosong yang didisi adukan, item 7.11.(6) Expansion Joint Tipe Baja Bersudut, dan 7.12.(2) Perletakan Elastomerik Alam Ukuran. sementara dalam Dokumen Pengadaan dipersyaratkan. 6. Analisa Harga Satuan yang disampaikan dalam Dokumen Penawaran tidak menyampaikan pekerjaan Divisi 10. item 10.1(6) Pengecatan Tembok Baru, dan item 10.1(7) Pengecatan Meni/Rilling sementara dalam Dokumen Pengadaan dipersyaratkan. 7. RK3K yang disampaikan dalam Dokumen Penawaran tidak menyampaikan pekerjaan Divisi 3. item 3.1.(3) Galian Struktur dengan kedalaman 0 - 2 meter, item 3.1.(4) Galian Struktur dengan kedalaman 2 - 4 meter, dan Divisi 7. item 7.10.(1) Pasangan Batu Kosong yang Diisi Adukan, Sehingga tidak menggambarkan penguasaan dalam menjaga keselamatan pekerja, alat dan lingkungan sekitar.
14 cv.angkasa - 65.545.271.0-102.000
15 CV. ARU AGUNG PERKASA - 02.503.247.5-101.000
16 PT. MUTIARA LAMKUTA - 01.966.186.7-101.000
17 CV. RATANA KONSTRUKSI - 17.651.806.3-102.000
18 CV. KHATAMI - 02.466.374.2-102.000
19 CV. RISFAR CORPORATION - 02.124.600.4-102.000
20 CV.AZZAM PERDANA - 31.629.970.0-102.000
21 CV. ANUGERAH ABADI - 75.279.995.7-101.000
22 CV. HALHAS JAYA - 72.319.794.3-102.000
23 CV. TD. DHARMA ACINDO - 01.932.208.0-102.000
24 CV. KARYA KONSTRUKSI - 03.255.784.5-102.000
25 CV. KAYAMA - 03.105.052.9-102.000
26 CV. RA 7 ES - 02.027.472.6-104.000
27 CV. BERANDA HIJAU - 66.171.219.0-101.000
28 CV. FARDIB KONSTRUKSI - 71.973.258.8-101.000
29 CV. MULTI KARYA - 02.552.574.2-106.000
30 CV.BUNGONG LAWANG - 66.203.799.3-101.000
31 CV. ANINDHIKA PRATAMA - 81.822.985.8-101.000
32 cv. sinar abadi - 84.374.165.3-106.000
33 CV. ZALFA MUTIARA - 82.351.628.1-102.000
34 CV. MULTI AGRO UTAMA - 02.177.253.8-102.000
35 CV. GAGAK HITAM REKAYASA - 82.351.539.0-102.000
36 CV. NAJWA INTAN PERMATA - 02.829.418.9-102.000
37 CV. PINTO RIMBA JAYA - 03.030.309.3-104.000
38 CV. MINA JAYA - 02.631.233.0-101.000 Rp 440.202.333,40 Rp 440.202.333,40 1. Metode Pelaksanaan yang disampaikan dalam dokumen penawaran pada pekerjaan Divisi 7. item 7.1 (7) Beton mutu sedang fc' 20 MPa tidak dijelaskan pengunaan peralatan Water Tanker secara terperinci sementara dalam Analisa harga satuan peralatan yaitu Con Pan. Mixer, Truck Mixer, dan Water Tanker. 2. Metode Pelaksanaan yang disampaikan dalam dokumen penawaran pada pekerjaan Divisi 7. item 7.1 (8) Beton mutu rendah fc'15 MPa tidak dijelaskan penggunaan peralatan Water Tanker secara terperinci sementara dalam Analisa harga satuan peralatan yaitu Concrete Mixer, dan Water Tanker dan tidak dijelaskan tahapan pekerjaan secara rinci sehingga metode yang disampaikan tidak menggambarkan penguasaan yang baik dalam penyelesaian pekerjaan. 3. Metode Pelaksanaan yang disampaikan dalam dokumen penawaran pada pekerjaan Divisi 7. item 7.1 (9) Beton siklop fc'15 MPa tidak dijelaskan penggunaan peralatan Concrete Mixer, Water Tanker, Con. Vibrator secara terperinci sementara dalam Analisa harga satuan peralatan yaitu Conc. Mixer, Water Tanker, Con. Vibrator. 4. Metode Pelaksanaan yang disampaikan dalam dokumen penawaran pada pekerjaan Divisi 7. item 7.1 (10) Beton mutu rendah fc'10 MPa tidak dijelaskan penggunaanperalatan Water Tanker secara terperinci sementara dalam Analisa harga satuan peralatan yaitu Concrete Mixer, dan Water Tanker. 5. Metode Pelaksanaan yang disampaikan dalam dokumen penawaran pada pekerjaan Divisi 7. item 7.9 (1) Pasangan Batu tidak dijelaskan penggunaan peralatan Concrete mixer dan Water Tanker secara terperinci sementara dalam Analisa harga satuan peralatan yaitu Concrete Mixer, dan Water Tanker. 6. Metode Pelaksanaan yang disampaikan dalam dokumen penawaran pada pekerjaan Divisi 7. item 7.10.(1) Pasangan Batu Kosong yang di isi adukan tidak dijelaskan penggunaan peralatan Concrete mixer dan Water Tanker secara terperinci sementara dalam Analisa harga satuan peralatan yaitu Concrete Mixer, dan Water Tanker.